Witness the installation of a WES turbine
- 1
The installation of the new WES80 turbine at windfarm Zijpe, The Netherlands
- 2
First, the rotor will be attached to the generator
- 3
Then, it’s time for the blades
- 4
Attaching the blades on the rotor
- 5
Time to tilt up the tower
- 6
There it goes...
- 7
Thightening the bolts
- 8
Don’t forget the covers
- 9
Cages under the nacelle
- 10
Finally, the nacelle can be lifted
- 11
Tightening the last bolts